I’ve been waiting to have a permanent front gate for the entrance for quite a long time. But there was an inherent order of operations that needed be followed. The gate couldn’t be installed until the driveway was paved. The driveway couldn’t be paved until the land was leveled. And the foreman suggested we not level the land for the driveway until the car park roof was done.

Well, in the last few weeks the car park roof was completed, the land was leveled and the driveway was paved. So we now have a front gate. It looks quite bigger.